Network code compliance tests:
Conducting compliance tests is essential to obtain the final operating permit (FON).

The obligation to conduct compliance tests arises from the European Commission Regulations on network codes:
NC RfG: COMMISSION REGULATION (EU) 2016/631 of 14 April 2016 establishing a network code on requirements for the connection of generation units to the grid.
NC DC: COMMISSION REGULATION (EU) 2016/1388 of 17 August 2016 establishing a network code on the connection of demand.
NC ER: COMMISSION REGULATION (EU) 2017/2196 of 24 November 2017 establishing a network code on the state of emergency and restoration of power system operations.
For our clients, we conduct comprehensive tests for energy generation units
(photovoltaic farms, wind farms, hydropower plants, biogas plants, and cogeneration plants), DSOs, and energy storage systems.
The tests are performed using Class A (Advanced) energy quality analyzers, in accordance with the requirements of the standard PN-EN 61000-4-30.
We conduct object-level tests for energy generation modules of types B, C, and D.
We operate throughout Poland
We thank our clients from all over Poland for the trust they have placed in us. On the attached map, we present selected projects, which represent only a small part of our experience. We approach each assignment with the utmost precision, tailoring our solutions to the individual needs and technical specifications of our clients. We encourage you to schedule a conversation to personally see how we can support your projects.